Industry
Data center construction sites
Data centers are being built across Finland, and the projects run from months to years. We bring a tester or inspector to your site for the whole project: soil testing, pipe pressure tests and inspections, and reports in English.
- Duration
- Months to years
- Area
- All of Finland
- Reports
- In English
- Results
- 5 min · inspection 24 h
- Pricing
- Hourly or fixed price
Services for your site
What is tested on a data center site
Large areas, thick structural layers and long pipelines: every phase is accepted by testing before the next one starts.
-
Bearing capacity
Acceptance testing of the subgrade, fills and structural layers with plate load tests before the next phase.
-
Compaction
Compaction control with Loadman on large areas where many test points are needed.
-
Pressure testing
Pressure and leak tightness tests for water mains and sewers before commissioning, test record in five minutes.
-
Pipe inspection
Handover inspections of wastewater and stormwater sewers and drains.
For the whole project
The same tester from start to handover
On a long project the tester knows the site, its requirements and its schedule. Testing follows the phases of the works, and visits do not need to be arranged one by one.
-
Results on site
Bearing capacity, compaction and pressure test results to your email within five minutes.
-
Inspection report with video
The CCTV inspection report and videos within 24 hours of the inspection.
-
Reports in English
Reports are prepared in English by default, which suits international projects.
-
Hourly or fixed price
The duration and price of the work are calculated from the drawings, using whichever model suits the project.
FAQ
Questions about data center projects
Can I hire a tester for the whole project?
Yes – that is the basis of our service: a tester or inspector for your project for its entire duration, from months to years. Pricing is based on the drawings, as an hourly rate or a fixed price.
Do you work outside the Helsinki region?
Yes. For long projects we come anywhere in Finland, and projects outside Finland are also possible. We do not travel far for a single test.
What language are the reports in?
English by default. If the client has its own report template or format requirements, the report follows them.
A tester or inspector for your project, for its entire duration
Tell us about your project and send the drawings: we use them to calculate the duration and price of the work, as an hourly rate or a fixed price.