Pipe pressure testing

A pressure test verifies that a new pipeline holds – in buried pipes as well as in the water and drainage pipes of new buildings. A clear test record is in your email five minutes after testing.

Applications
Networks · New buildings
Pipes
Water mains · Sewers
Test record
5 min by email
Area
All of Finland

When pipelines are tested

The test is done before commissioning, and its requirements – test pressure, test period and acceptance limit – come from the design or the client. The test record is the document for contract handover.

  • Commissioning a new water main or sewer. The pipeline is verified to hold before it is taken into use.
  • Pipes of new buildings. New water and drainage pipes are tested before the structures are closed.
  • After connection or repair work. A new connection or repaired section is tested before backfilling or commissioning.

How it works

From initial data to test record

The test pressure and test period come from the design. If they have not been specified, we agree on the procedure before the test.

  1. Step 01

    Initial data

    Pipe material, diameter and length, and the required test pressure and test period.

  2. Step 02

    Preparation

    The test section is plugged, filled with water and the air is removed.

  3. Step 03

    Test

    The pressure is raised to the test pressure and monitored and recorded for the whole test period.

  4. Step 04 · 5 min

    Test record

    A clear test record is in your email five minutes after testing.

FAQ

Questions about pressure testing

How quickly do I get the test record?

A clear test record is in your email five minutes after testing, so the next phase can continue right away.

Is the test done before or after backfilling?

The design or the client decides. When the joints are visible, a possible leak is easy to locate. A test after backfilling also shows that the backfill has not damaged the pipe.

What if the pipeline fails the test?

A failed result is recorded in the test record. The leak is located – by CCTV inspection if needed – and the test is repeated after the repair.

What language is the test record in?

Finnish or English. We use our own reporting template.

How much does a pressure test cost?

The pricing model is chosen per project in the way that best serves the result: an hourly rate or a fixed price. The price depends on the number and length of the test sections and the pipe size. Several sections on the same visit cost less than separate visits. Contact us and let's look at your project together.

A tester or inspector for your project, for its entire duration

Tell us about your project and let's find the best possible way to carry out the testing and inspections for your project.